Peter Powell of The ACHR NEWS has written an article regarding the application of a fully integrated packaged central plant by Chil-Pak® at the Glendale Media Center. The Media Center serves as the operation headquarters for media staff during national sporting events held at the University of Phoenix Stadium-a facility that has been called one of the “10 most impressive sports facilities on the globe.” Powell notes, “One challenge was to create…comfort cooling at the center in a part of the country with frequent 100°F or warmer days.”
One of the reasons that Chil-Pak® was chosen for the project according to Sam Macrane, product manager for Chil-Pak®, was for their “ability to bring all the variables associated with the engineering and construction of a typical central plant into a single cost- and space-efficient cabinet, where all electrical pumps, piping, controls, chillers, and cooling tower could be integrated in a controlled ISO 9001 factory environment. This integrated package plant concept provided a complete chilled water solution at the lowest possible cost to the building owner in just a few months.”
Click the following link to read the full article:
To find out more about the packaged central plant solution by Chil-Pak® visit www.chil-pak.com
For specific product and project design questions contact Sam Macrane at sales@chil-pak.com or by calling 480.503.8040.